Detailed design
Port, maritime and civil works designed, supervised and tested since 1992. The full case studies follow each work from context to construction.
Ports and cities where SISPI has designed or supervised works. Select a point to filter the list.
In progress Salerno2023 – 2026
Ponente Pier: strengthening of the Ro-Ro quay
363 m of quay refaced with a combined wall of Ø1800 tubes and sheet piles, without stopping the terminal.
Quays, piers and consolidation 35 M€
Napoli2022 – 2026
Vigliena reclamation basin – Darsena di Levante
A new 290 m combined retaining wall to make safe again a 43,000 m² basin intended for dredged sediments.
Dredging, reclamation and environment 17 M€
Napoli2020 – 2025
Pisacane Pier: completion of the strengthening of the eastern quay
Quays, piers and consolidation 18 M€
In progress Napoli2023 – 2026
Dry docks No. 1 and No. 2: rehabilitation and upgrading
Special structures and plants 1.0 M€
Ravenna2020 – 2023
Ravenna Port Hub: deepening of the channels and new terminal on the Trattaroli peninsula
Dredging, reclamation and environment 217 M€
Ravenna2023 – 2024
Port of Ravenna: upgrading of the operational quays
Quays, piers and consolidation 31 M€
Taranto2019 – 2023
San Cataldo Pier: reconstruction of the pier head and upgrading of the eastern quay
Quays, piers and consolidation 15 M€
Taranto2014 – 2015
Taranto Multi-sector Pier: modernisation of the berthing quay
Terminals and platforms 62 M€
Cagliari2021
Shipbuilding district in the eastern outer harbour of the Porto Canale of Cagliari
Quays, piers and consolidation 27 M€
In progress Catanzaro2019 – 2026
Completion of the marina and fishing port of Catanzaro Marina
Marinas and landings 44 M€
Savona2019 – 2023
Savona: deepening of quays 8-9-10 for cruise ship adaptation
Quays, piers and consolidation 17 M€
In progress Napoli2024 – 2025
Monumental area of the port of Naples: underground car parks and new passenger front
Buildings, architecture and restoration 28 M€
Salerno2019 – 2021
Piazza della Libertà: seaward retaining wall and underground car park underpass
Special structures and plants 16 M€
La Spezia2017 – 2020
New Fire Brigade station at Calata Malaspina
Buildings, architecture and restoration 2.5 M€
Casoria2017 – 2018
Casoria Sports Hall for the 2019 Universiade
Buildings, architecture and restoration 1.9 M€
Oristano2019 – 2020
Torregrande marina and fishing port
Marinas and landings 4.0 M€
In progress Napoli2024
Infrastructure works at the San Vincenzo Pier for the berthing of two MTC/MTF auxiliary vessels
Quays, piers and consolidation
In progress Napoli2024
Underground car park and surface works at Calata Piliero
Buildings, architecture and restoration
Ischia2021
Safety works along the coastal stretch at hydrogeological risk between San Francesco beach and Fortino
Breakwaters and coastal defences
Napoli2019
Rehabilitation and safety works of quay 33B on the north yard of dry dock no. 3
Quays, piers and consolidation 14 M€
Salerno2013 – 2014
Extension of the Manfredi Pier
Quays, piers and consolidation 9.5 M€
Salerno2013 – 2014
Static consolidation and functional upgrade of the head of the Tre Gennaio Pier
Quays, piers and consolidation 4.7 M€
Napoli2007 – 2015
Static consolidation and functional upgrade of the east quay of the Vittorio Emanuele Pier
Quays, piers and consolidation 21 M€
Salerno2011 – 2013
Static consolidation and functional upgrade of the east quay of the Trapezio Pier
Quays, piers and consolidation 21 M€
Salerno2012 – 2013
Static consolidation and functional upgrade of the Ligea quay – functional phase I
Quays, piers and consolidation 6.1 M€
Procida2003 – 2009
Functional upgrade of Marina di Corricella
Marinas and landings 0.2 M€
Procida2003 – 2009
Functional upgrade of the Marina di Chiaiolella marina
Marinas and landings 0.8 M€
Napoli2007 – 2008
Consolidation and strengthening of the east quay of the Carmine Pier
Quays, piers and consolidation 10 M€
Procida2004 – 2008
Functional upgrade of the Marina di Sancio Cattolico marina
Marinas and landings 5.8 M€
Napoli2001 – 2005
Extension and functional upgrade of the Flavio Gioia Pier
Terminals and platforms 6.0 M€
Napoli2001 – 2005
Extension of the Immacolatella Vecchia Pier
Terminals and platforms 13 M€
Pisa2004
Construction of the emergency department of the Cisanello hospital
Buildings, architecture and restoration
Napoli2001 – 2005
Extension and functional upgrade of the Bausan Pier
Terminals and platforms 8.7 M€
Napoli2001 – 2005
Covering of the former Pollena channel
Dredging, reclamation and environment 2.3 M€
Ravenna2019
Reconstruction of the Enel Sud quay – Porto Corsini
Quays, piers and consolidation 9.4 M€
Napoli2018
Extraordinary maintenance and functional upgrade of the state-owned building at Calata Beverello
Buildings, architecture and restoration 1.2 M€
Napoli2018
Demolition of the steel jetty and overhead unloader at Calata della Marinella, as part of the seabed dredging
Dredging, reclamation and environment 0.4 M€
Torre del Greco1998 – 1999
Functional upgrade and completion of the harbour defence works at Torre del Greco
Breakwaters and coastal defences 3.1 M€
Napoli
Rehabilitation and enhancement of the facades of the Casa del Portuale building
Buildings, architecture and restoration
Napoli
Functional upgrade of the slipway and launching structures at the Darsena Bacini
Special structures and plants
Casoria
Moscati Maglione comprehensive school
Buildings, architecture and restoration
Capua1990 – 1999
CIRA Capua: civil works of the IWT, LISA and PWT wind tunnels
Special structures and plants 15 M€
Caserta1996 – 1998
New Cardiology and Cardiac Surgery wing, Caserta Hospital
Buildings, architecture and restoration 1.2 M€
Lecce2000
Infectious diseases ward, Vito Fazzi Hospital, Lecce
Buildings, architecture and restoration 1.0 M€
Napoli2004 – 2013
Naples Maritime Station: façade restoration and canopy rehabilitation
Buildings, architecture and restoration
Savona1998
Coastal erosion protection of the Genoa–Ventimiglia railway
Breakwaters and coastal defences 1.1 M€
No project matches the selected filters.