Projects / Quays, piers and consolidation
Static consolidation and functional upgrade of the head of the Tre Gennaio Pier
- Client
- Autorità Portuale di Salerno (mandataria di raggruppamento)
- Period
- 2013 – 2014
- Works value
- € 4.743.442
- Port / location
- Salerno
The works consolidated the severely deteriorated existing quay to allow the seabed to be deepened to −15.50 m as foreseen by the new Port Master Plan. The 67 × 30 m structure consists of a modular vertical wall of 21 Ø 1,800 mm tubular profiles (h = 33 m) and 22 double AZ18/700 sheet piles (h = 26.50 m).
Anchoring is provided by 59 horizontal Dywidag Ø 47 mm bars at 1.20 m spacing, fixed to an anchor beam 24 m behind the capping beam and founded on 26–30 m long Ø 250 mm raking micropiles. Before the combined wall was built, urgent works not included in the original contract were carried out to prevent the quay from collapsing. Three 1,000 kN bollards and two V-fenders were installed on the head; cathodic protection and first-flush stormwater collection complete the works.