The first phase (L = 123 m) was consolidated with a combined wall of 38 Ø 1,800 mm S355GP steel tubular piles and double AZ18 sheet piles, socketed into the limestone bedrock with 10 m long Ø 1,720 mm reinforced bored piles. The reinforced-concrete capping beam (3.90 × 2.00 m) is anchored by ten 17 m long concrete ties to anchor blocks on raking piles, each with 15 Ø 250 mm micropiles.
The works include the service channel and duct, the first-flush stormwater treatment tank, impressed-current cathodic protection and about 4,300 m² of flexible paving.