Skip to content

Projects / Special structures and plants

Dry docks No. 1 and No. 2: rehabilitation and upgrading

Demolition of a historic caisson gate and dewatering of dry dock No. 1: detailed engineering in a unique industrial space.

Client
Autorità di Sistema Portuale del Mar Tirreno Centrale (in raggruppamento)
Period
2023 – 2026
Works value
€ 989.258Lavori complementari: demolizione della barca-porta del bacino n. 2 e svuotamento del bacino n. 1 (fondi complementari PNRR).
Port / location
Napoli
Sector
Special structures and plants

Detailed design, works supervision and health & safety coordination for the works complementary to the rehabilitation of dry dock No. 2 and the upgrading of the pumping plant of dry docks 1 and 2 in the port of Naples.

  1. 01

    The context

    The dry docks of the port of Naples are early twentieth-century infrastructure still essential to the shipbuilding industry. Before rehabilitating the dock walls and the pumping plant, the caisson gate of dry dock No. 2 – a large floating steel caisson – had to be removed and dry dock No. 1 safely dewatered.

    After
    Before
    Drag to compare before and after
  2. 02

    The design

    SISPI designed the method for dismantling and demolishing the caisson gate and the dewatering sequence for dry dock No. 1, with the necessary structural and hydraulic checks and a specific health and safety plan for work in confined spaces and below sea level.

  3. 03

    The site

    The phases were followed by the works supervision with systematic drone surveys, useful both for control and for documenting the works within the operating shipyard area.

The result

The complementary works paved the way for the rehabilitation of dry dock No. 2 and the new pumping plant, extending the service life of an industrial heritage asset of the port.

2dry docksinvolved in the works