Skip to content

Projects / Quays, piers and consolidation

Rehabilitation and safety works of quay 33B on the north yard of dry dock no. 3

Client
Autorità di Sistema Portuale del Mar Tirreno Centrale (mandataria di raggruppamento)
Period
2019
Works value
€ 14.334.560
Port / location
Napoli
Sector
Quays, piers and consolidation

The works included a wall of bored reinforced-concrete piles (Ø 1,219 mm, 22 m long) close to the quay edge, supported by ground improvement of the embankment with secant jet-grouting columns (Ø 2,000 mm) and inclined micropiles (Ø 250 mm) to resist seismic thrust and bollard pull.

The superstructure is a 10.40 m wide reinforced-concrete slab with quartz finish, partly built with precast lattice slabs to shorten construction time, with ducts for water and electrical services and a stormwater collection system. The works are completed by 10 bollards of 100 t, 19 fenders and 3 recessed ladders.