Projects / Quays, piers and consolidation
Pisacane Pier: completion of the strengthening of the eastern quay
From detailed design to works supervision: the full cycle of a structure in the heart of the commercial port of Naples.
- Client
- Autorità di Sistema Portuale del Mar Tirreno Centrale (mandataria di raggruppamento)
- Period
- 2020 – 2025
- Works value
- € 17.925.201Progettazione esecutiva e CSP (2020-22, 17,0 M€); direzione lavori e CSE (2023-25).
- Port / location
- Napoli
SISPI, lead firm of the joint venture, prepared the detailed design and coordinated health and safety, then supervised the works for the completion of the strengthening and reinforcement of the eastern quay of the Pisacane Pier.
-
01
The context
The eastern quay of the Pisacane Pier, affected by previous partial works, required the completion of its strengthening to adapt it to current loads and depths in a high-density operating area of the port of Naples.

-
02
The design
The detailed design defines the reinforcement of the quay with new structures built against the existing one, ground improvement, new furniture, paving and services, with a phased organisation compatible with terminal operations.
-
03
The site
With SISPI also entrusted with works supervision and health and safety coordination during construction, the works were carried out between 2023 and 2025 with continuous photographic documentation of the driving, concreting and finishing phases.





The result
A completed and accepted quay, giving the port of Naples back a modern and safe berth. It is one of the clearest examples of the SISPI method: those who design follow the structure through to handover.