Projects / Quays, piers and consolidation
Banchina Rossa: restoration of functionality
Phased strengthening of a historic quay in the commercial port, carried out in close contact with Ro-Ro operations.
- Client
- Autorità di Sistema Portuale del Mar Tirreno Centrale (in raggruppamento)
- Period
- 2023 – 2026
- Works value
- € 3.592.274Manutenzione straordinaria: consolidamento e adeguamento funzionale.
- Port / location
- Salerno
Final design, works supervision and health & safety coordination for the extraordinary maintenance of the Banchina Rossa in the commercial port of Salerno, in successive phases (1, 2A, 2B) agreed with the Port Authority and the terminal operators.
-
01
The context
The Banchina Rossa, adjoining the Ponente Pier, showed structural deterioration that limited its use. The works had to be carried out in sections, progressively returning the areas to the terminal and sharing logistics with the adjacent sites.
After
BeforeDrag to compare before and after -
02
The design
The design strengthens the existing structure and upgrades its functionality: new coping beam, quay furniture, paving and services, with the works organised in three phases (1, 2A between chainages 140 and 180 m, 2B) to minimise interference.
-
03
The site
Handover of phase 1 on 10 June 2024, phase 2A from January 2025, phase 2B from October 2025: each section was completed within the contractual time and passed its structural acceptance test before moving on to the next. SISPI's works supervision certified completion jointly with the contractor and followed the technical and administrative acceptance inspections.





The result
A quay that is once again fully operational, consistent with the system of works that SISPI is carrying out on the western front of the commercial port of Salerno.