Projects / Quays, piers and consolidation
3 Gennaio Pier: strengthening and functional upgrading
The largest of the PNRR sites in Salerno followed by SISPI: a commercial quay entirely rebuilt for the new loads and new depths.
- Client
- Autorità di Sistema Portuale del Mar Tirreno Centrale (in raggruppamento)
- Period
- 2022 – 2026
- Works value
- € 33.342.586Consolidamento e adeguamento funzionale della banchina di ponente del Molo 3 Gennaio.
- Port / location
- Salerno
Feasibility study, final design, works supervision and health & safety coordination for the strengthening of the western quay of the 3 Gennaio Pier in the commercial port of Salerno, continuing the strengthening of the pier head supervised by SISPI in 2013-2014.
-
01
The context
The western quay of the 3 Gennaio Pier serves the container and Ro-Ro traffic of the commercial port. The original structures were no longer adequate for the operating loads, the design depths and the seismic standards; the works, funded by the PNRR, had to be carried out in successive areas handed over to the contractor between June and August 2024, without taking operating capacity away from the terminal.
After
BeforeDrag to compare before and after -
02
The design
SISPI developed the feasibility study and the final design of the strengthening: a new combined wall against the existing quay, coping beam and anchoring system, ground improvement, renewal of paving, services and quay furniture with new-generation bollards and fenders. The technical choices take up and update those SISPI had successfully applied to the head of the same pier ten years earlier.
-
03
The site
The works supervision governed a variation and a supplementary agreement that brought the contract value to M€ 33.5, coordinating the works with the terminal operators and with the neighbouring Banchina Rossa and Ponente Pier sites. Periodic photographic monitoring documents the progress of the phases; completion is scheduled within the PNRR deadline of 30 June 2026.





The result
A commercial quay suitable for the new loads and depths, with modern services and equipment, which closes the cycle of SISPI's work on the 3 Gennaio Pier: the pier head in 2013-2014, the western quay today.