Projects / Quays, piers and consolidation
Ponente Pier: strengthening of the Ro-Ro quay
363 m of quay refaced with a combined wall of Ø1800 tubes and sheet piles, without stopping the terminal.
- Client
- Autorità di Sistema Portuale del Mar Tirreno Centrale (in raggruppamento)
- Period
- 2023 – 2026
- Works value
- € 34.551.536Messa in sicurezza del Molo di Ponente. Completamento I stralcio: 14,5 M€; II stralcio: 2,6 M€.
- Port / location
- Salerno
Design and works supervision for the strengthening and functional upgrading of the Ponente Pier in the commercial port of Salerno: a new retaining wall against the existing blockwork wall, anchor blocks on micropiles, paving, services and provision for shore power (cold ironing).
-
01
The context
The Ponente Pier is the Ro-Ro and Ro-Pax terminal of the port of Salerno. Multibeam surveys and underwater inspections had revealed cavities at the toe of the cyclopean blockwork wall, scour caused by ship propellers and washing-out of the backfill. The whole quay had to be strengthened and made suitable for future depths of up to −16 m and loads of 60 kPa, while keeping the terminal operational.
After
BeforeDrag to compare before and after -
02
The design
The solution designed by SISPI is a refacing: a combined wall of 25 m long Ø1800 × 20 mm steel tubes alternating with 22 m long ESZ 20/700 sheet piles, vibro-driven from the sea along the full 363 m. At the top, a reinforced concrete coping beam transfers the thrust to anchor blocks founded on micropiles. The cavities are filled and the ground improved by vibroflotation; these are followed by flexible paving over a 20 m depth, a new first-flush stormwater collection and treatment network, a water and fire-fighting system, cathodic protection, SCADA and provision for shore power (cold ironing). Bollards are designed for 1,000 kN.
-
03
The site
Occupation of the water area is limited to a 50 m strip and the site was organised in phases along the quay front, with logistics at the root of the pier in the areas of the Banchina Rossa site. Load tests on the micropiles, survey beacons and inclinometer tubes for monitoring, recovery of an interfering historic fender found on the seabed: the works supervision governed every phase through to the structural acceptance test, with drone footage of progress.





The result
A modern quay for Ro-Ro traffic, compliant with current seismic standards, ready for the deepening of the seabed and for supplying ships with electricity from shore. The completion of the pier continues with Phases 1 and 2, also designed and supervised by SISPI.




Related projects
In progress Salerno2023 – 2026
Banchina Rossa: restoration of functionality
Quays, piers and consolidation 3.6 M€
Salerno2023 – 2026
Extension of the Manfredi Pier for cruise traffic
Quays, piers and consolidation 13 M€
In progress Salerno2022 – 2026
3 Gennaio Pier: strengthening and functional upgrading
Quays, piers and consolidation 33 M€