Skip to content

Projects / Quays, piers and consolidation

Consolidation and strengthening of the east quay of the Carmine Pier

Client
Autorità Portuale di Napoli (in raggruppamento)
Period
2007 – 2008
Works value
€ 10.349.726
Port / location
Napoli
Sector
Quays, piers and consolidation

The structural strengthening of the east quay consisted of a wall of Ø 1,200 mm bored reinforced-concrete piles along the existing quay and part of the head, tied at the top by a reinforced-concrete capping beam and anchored at the ends with steel and concrete ties to anchor blocks on Ø 250 mm micropiles. The water, electrical and stormwater systems were also upgraded.