The extension of the Manfredi Pier is part of the wider functional upgrade of the Port of Salerno promoted by the Port Authority and provides a new cruise berth suited to the latest generation of cruise ships (up to 300 m long). The structure is 180 m long and 35 m wide, with an area of about 5,600 m².
A reclaimed-fill jetty was built, confined by cofferdam-type structures: mutually tied vertical walls of H-section steel profiles (L = 27 m on the west side, 16.50 m on the east side) alternating with Z-shaped AZ sheet piles. Design depths are −11.50 m on the west quay and −8.00 m on the east quay; the walls are connected at the top by horizontal M80 bar ties at a typical 1.972 m spacing.
The yard is formed of compacted quarry fill with a 55 cm flexible pavement. Sixteen 1,000 kN cast-iron bollards and 14 V-fenders were installed; the works are completed by impressed-current cathodic protection, a first-flush stormwater collection and treatment system, lighting and reinforced-concrete service ducts for the water and fire-fighting networks.