Skip to content

Projects / Quays, piers and consolidation

Extension of the Manfredi Pier

Client
Autorità Portuale di Salerno (mandataria di raggruppamento)
Period
2013 – 2014
Works value
€ 9.459.358
Port / location
Salerno
Sector
Quays, piers and consolidation

The extension of the Manfredi Pier is part of the wider functional upgrade of the Port of Salerno promoted by the Port Authority and provides a new cruise berth suited to the latest generation of cruise ships (up to 300 m long). The structure is 180 m long and 35 m wide, with an area of about 5,600 m².

A reclaimed-fill jetty was built, confined by cofferdam-type structures: mutually tied vertical walls of H-section steel profiles (L = 27 m on the west side, 16.50 m on the east side) alternating with Z-shaped AZ sheet piles. Design depths are −11.50 m on the west quay and −8.00 m on the east quay; the walls are connected at the top by horizontal M80 bar ties at a typical 1.972 m spacing.

The yard is formed of compacted quarry fill with a 55 cm flexible pavement. Sixteen 1,000 kN cast-iron bollards and 14 V-fenders were installed; the works are completed by impressed-current cathodic protection, a first-flush stormwater collection and treatment system, lighting and reinforced-concrete service ducts for the water and fire-fighting networks.