
Projects / Quays, piers and consolidation
Static consolidation and functional upgrade of the east quay of the Trapezio Pier
- Client
- Autorità Portuale di Salerno (mandataria di raggruppamento)
- Period
- 2011 – 2013
- Works value
- € 21.437.765
- Port / location
- Salerno
The works covered the east quay (L = 383 m) and the head (L = 27.60 m) of the Trapezio Pier, with a modular vertical combined wall of 131 S355GP steel tubular piles (outer Ø 1,800 mm, 22 mm thick, L = 18.50–33 m) alternating with double AZ18 sheet piles in S355J0H steel, at a 313 cm pile–sheet module.
The reinforced-concrete capping beam (3.50 × 2.00 m) is anchored by 34 horizontal 17 m long concrete ties to 33 anchor blocks on ±30° raking micropiles. The works are completed by the first-flush drainage channel, the fire-fighting duct, carbon-filter manholes, impressed-current cathodic protection, 25 bollards, 33 fenders and about 10,000 m² of yard paving.