Skip to content

Projects / Quays, piers and consolidation

Savona: deepening of quays 8-9-10 for cruise ship adaptation

Anchors instead of micropiles: a solution designed to allow greater depths at the cruise quays.

Client
Autorità di Sistema Portuale del Mar Ligure Occidentale
Period
2019 – 2023
Works value
€ 16.583.642Progettazione esecutiva.
Port / location
Savona
Sector
Quays, piers and consolidation
SISPI services

Detailed design of the deepening of quays 8, 9 and 10 of the Savona port basin for the berthing of large cruise ships.

  1. 01

    The context

    The historic gravity quays did not allow the deepening of the seabed required by new-generation cruise ships without losing stability.

  2. 02

    The design

    SISPI designed the strengthening with a new retaining wall and active anchors, a solution adopted in place of the micropiles originally planned, with the geotechnical and seismic checks and the tensioning test programme.

  3. 03

    The site

    Site assistance in 2019 with documentation of the drilling and tensioning phases.

The result

Adequate depths and safe quays for Savona's cruise traffic.

3quaysdeepened
16.6M€works value