
Projects / Breakwaters and coastal defences
Functional upgrade and completion of the harbour defence works at Torre del Greco
- Client
- ICAD Costruzioni Generali S.r.l. – Regione Campania
- Period
- 1998 – 1999
- Works value
- € 3.050.000
- Port / location
- Torre del Greco
- SISPI services
The design, winner of the design-and-build competition held by the Campania Region, includes works to enlarge the harbour basin, functionally upgrade the port and strengthen the outer defences, with particular attention to the environmental context. The windward breakwater was extended by about 90 m and its quay widened to twice its original width.