Skip to content

Projects / Breakwaters and coastal defences

Functional upgrade and completion of the harbour defence works at Torre del Greco

Client
ICAD Costruzioni Generali S.r.l. – Regione Campania
Period
1998 – 1999
Works value
€ 3.050.000
Port / location
Torre del Greco
Sector
Breakwaters and coastal defences

The design, winner of the design-and-build competition held by the Campania Region, includes works to enlarge the harbour basin, functionally upgrade the port and strengthen the outer defences, with particular attention to the environmental context. The windward breakwater was extended by about 90 m and its quay widened to twice its original width.