Taranto Multi-sector Pier: modernisation of the berthing quay

Piled widening of the quay, crane rail beams for the new cranes and technical and environmental dredging down to −16.50 m.

Client
Autorità Portuale di Taranto (in raggruppamento)
Period
2014 – 2015
Works value
€ 61.874.648Progettazione esecutiva e CSP (quota SISPI 65,76%).
Port / location
Taranto
Sector
Terminals and platforms

Detailed design and health & safety coordination for the redevelopment of the Multi-sector Pier in the port of Taranto: piled widening of the berthing quay, new crane rails and dredging of the seabed.

  1. 01

    The context

    Adapting 1,500 m of container quay to latest-generation ships: deeper water, larger and heavier cranes, and the management of partly contaminated sediments in a site of national interest.

  2. 02

    The design

    The detailed design provides for the widening of the quay with a deck on large-diameter piles, new crane rail beams, upgrading of the services and technical and environmental dredging with disposal of the sediments in a reclamation basin.

The result

The works, worth almost 62 million euros, enabled the relaunch of the Taranto container terminal and the resumption of transhipment traffic.

61.9M€works value
−16.5mdredging depth