New breakwater for the outer harbour of Taranto – eastern section
Feasibility study and environmental impact assessment of a new-generation rubble-mound breakwater in the Mar Grande.
- Client
- Autorità di Sistema Portuale del Mar Ionio – Porto di Taranto
- Period
- 2022 – 2023
- Works value
- € 46.371.767PFTE e Studio di impatto ambientale – tratto di levante.
- Port / location
- Taranto
- SISPI services
Technical and economic feasibility design (PFTE) and Environmental Impact Study of the new breakwater protecting the outer harbour of Taranto, eastern section.
-
01
The context
Protecting the berths of the outer harbour from sirocco and libeccio storms, in deep water, in a sensitive environmental context and with the need to assess alternative alignments and structural types.
-
02
The design
SISPI carried out the metocean study and wave modelling, compared rubble-mound and caisson solutions, defined the alignment and cross-section of the breakwater and prepared the Environmental Impact Study, with the materials balance and the analysis of interference with port activities and fishing.
The result
A PFTE complete with EIS that allows the Port Authority to start the permitting stages and the subsequent design of a project worth over 46 million euros.
Related projects
Taranto2019 – 2023
San Cataldo Pier: reconstruction of the pier head and upgrading of the eastern quay
Quays, piers and consolidation 15 M€
Taranto2014 – 2015
Taranto Multi-sector Pier: modernisation of the berthing quay
Terminals and platforms 62 M€
In progress Napoli2023 – in corso
Duca d’Aosta breakwater – strengthening and extension
Breakwaters and coastal defences 81 M€