Projects / Quays, piers and consolidation
Static consolidation and functional upgrade of the east quay of the Vittorio Emanuele Pier
- Client
- Autorità Portuale di Napoli (in raggruppamento)
- Period
- 2007 – 2015
- Works value
- € 21.369.066
- Port / location
- Napoli
The scheme included the removal of the east panel, the consolidation of the quay wall and the widening of the existing block quay with a piled deck.
The walls of the east quay (352.30 m), shore quay (40 m) and head quay (20 m) were consolidated with 30 m long Ø 250 mm micropiles at variable inclination and a reinforced-concrete capping beam, anchored in section A to an anchor beam on 32 Ø 500 bored piles and in section B to 18 reinforced-concrete ties connected to anchor blocks on raking micropiles.
The widening deck rests on 48 m long Ø 1,200 mm bored piles at 7.5 m spacing, with precast pile caps and permanent lattice formwork completed by in-situ concrete. The quay is finished with industrial paving, 100 t bollards at 15 m spacing and cylindrical fenders.