Static consolidation and functional upgrade of the east quay of the Vittorio Emanuele Pier

Client
Autorità Portuale di Napoli (in raggruppamento)
Period
2007 – 2015
Works value
€ 21.369.066
Port / location
Napoli
Sector
Quays, piers and consolidation

The scheme included the removal of the east panel, the consolidation of the quay wall and the widening of the existing block quay with a piled deck.

The walls of the east quay (352.30 m), shore quay (40 m) and head quay (20 m) were consolidated with 30 m long Ø 250 mm micropiles at variable inclination and a reinforced-concrete capping beam, anchored in section A to an anchor beam on 32 Ø 500 bored piles and in section B to 18 reinforced-concrete ties connected to anchor blocks on raking micropiles.

The widening deck rests on 48 m long Ø 1,200 mm bored piles at 7.5 m spacing, with precast pile caps and permanent lattice formwork completed by in-situ concrete. The quay is finished with industrial paving, 100 t bollards at 15 m spacing and cylindrical fenders.