Static consolidation and functional upgrade of the west and head quays of the Trapezio Pier

Client
Autorità Portuale di Salerno (mandataria di raggruppamento)
Period
2014 – 2016
Works value
€ 33.539.059
Port / location
Salerno
Sector
Quays, piers and consolidation

The works consolidated and upgraded the west quay over a length of about 380 m. A modular vertical combined wall was built with steel tubular piles (outer Ø 1,800 mm, 22 mm thick) alternating with 22 m long AZ18 sheet piles, anchored by reinforced-concrete tie-rods to anchor blocks on inclined micropiles.

A reinforced-concrete capping beam connects the piles at the top. The works are completed by quay furniture, cathodic protection, paving and a stormwater drainage system.