Projects / Quays, piers and consolidation
Static consolidation and functional upgrade of the west quay of the Manfredi Pier
- Client
- Autorità Portuale di Salerno (mandataria di raggruppamento)
- Period
- 2011 – 2013
- Works value
- € 8.479.531
- Port / location
- Salerno
- SISPI services
The west and head quays were consolidated and upgraded by vibro-driving a modular vertical combined wall of Ø 1,118 mm tubular piles and AZ18 sheet piles, bonded to the existing wall with C20/25 concrete fill. A reinforced-concrete capping slab on vertical micropiles tops the wall; water and electrical services and quay furniture complete the works.
The new structures resist earth pressure under static and seismic conditions and the horizontal loads from ships mooring and berthing. During construction, urgent works were carried out after the partial collapse of the quay wall, with sensitive interference with the adjacent Maritime Station site, resolved through complex coordination.