Static consolidation and functional upgrade of the Ligea quay – functional phase II

Client
Autorità Portuale di Salerno (mandataria di raggruppamento)
Period
2014 – 2016
Port / location
Salerno
Sector
Quays, piers and consolidation

The consolidation of the head of the Ligea quay, about 127 m long, uses a modular vertical combined wall similar to the Trapezio one: large-diameter steel tubular piles alternating with AZ18 sheet piles at 313 cm spacing, with pile lengths varying with the ground stratigraphy.

The wall is topped by a reinforced-concrete capping beam structurally connected to the piles and tied into the works already completed in the first phase.