
Projects / Quays, piers and consolidation
Static consolidation and functional upgrade of the Ligea quay – functional phase II
- Client
- Autorità Portuale di Salerno (mandataria di raggruppamento)
- Period
- 2014 – 2016
- Port / location
- Salerno
- SISPI services
The consolidation of the head of the Ligea quay, about 127 m long, uses a modular vertical combined wall similar to the Trapezio one: large-diameter steel tubular piles alternating with AZ18 sheet piles at 313 cm spacing, with pile lengths varying with the ground stratigraphy.
The wall is topped by a reinforced-concrete capping beam structurally connected to the piles and tied into the works already completed in the first phase.
